I will be installing a 75kva transformer in a concrete tilt up building and all of the steel columns are covered with drywall so it might be difficult to run my GEC. I think the closest column is about 25 ft from where the transformer will be location. My thought is to install an access door in the drywall so that the connection is accessible. Any thoughts on this? Should I just drive a ground rod or is that even an acceptable alternative ? I think the columns are round post and I'm not even sure if it's appropriate to drill and tap my connection point or if it might be require to cad weld the connection?